DATE Project Name Project Description
2019.07~2020.07 Detail Design of Youngjong-Cheongra No.3 Bridge Simulation of Ship Crash
2018.05~2018.08 Structural Performance Analysis of Stranded Wire Structural performance review According to stranded wire corrosion
2015.08~2016.08 Cambodia 311Km Road Project DETAIL ENGINEERING FOR 311KM ROAD
2015.03~2015.05 5,400 DWT Project 5,400DWT SEA TRANSPORTATION STUDY
2015.02~2015.03 Old Yang-Su Bridge Dismantlement Project Verification for Capsizing of Transportation Barge
2014.12~2015.02 GSP Neptun Project Bridge Lifting and Mooring Design using 900ton Derric Crane
2013.10-2014.05 Old-Yang-Su Grand Bridge Dismantle PJT Bridge Dismantle and Barge Motion and Super-Lift Engineering
2013.07-2013.12 Gun-Jang Grand Bridge PJT 3600ton Bridge Lifting and Derric Crane Dynamic Motion Analysis
2013.01-2013.02 TOP-SOME WALKWAY BRIDGE PJT Detail design for Bridge
2012.03-2012.10 YangSu Grand Bridge Project Bridge Float Over and Stability Design
2012.02-2012.05 Young Kwang-HyeJae Grand Brideg Bridge Ship Collision and Navigation Desion for Yoosin/Hyoundai E&C
2011.03-2011.05 WHAYANG-CHEKUM PHASE NO.2 OFFSHORE BRIDGE TURNKEY Bridge Ship Collision and Navigation Desion for HEC
2011.02-201106 NOWHA-GUDO PHASE NO.2 OFFSHORE BRIDGE TURNKEY PJT Bridge Ship Collision and Navigation Desion for HEC
2010.07-2010.09 ManKyeong Phase No. 5 Ship Collision and Navigatio Ship Collision and Navigation Desion for Korea Gorverment - Hanjin E&C - Whansin Eng
2010.05-2010.10 ManKyeong Phase No. 3 Ship Collision and Navigatio Ship Collision and Navigation Desion for Korea Gorverment - Lotte E&C-Dong-Il Eng
2010.05-2010.07 Turnkey Pjt Sin gi-Kogum Bridge - Ship Collision a Ship Collision and Navigation Desion for Kolon E&C Co., Ltd. - Yoosin Eng
2010.03-2010.09 SORAE POGU Port Ship Collision and Navigation Desi Ship Collision and Navigation Desion for Samsung Construction and Engineering Co., Ltd.
2010.03-2010.04 Han River Bridge - Ship Collision and Navigation D Ship Collision and Navigation Desion for Hangang Development Co., Ltd. - Yoosin/Hanjong Eng
2009.12-2010.01 HA YI- SIN YI BRIDGE TURNKEY PROJECT SHIP MANEUVERING SIMULATION, SHIP COLLISION AND RISK ANALYSIS FOR YUSIN AND NAMYANG CONSTRUCTION CO. LTD.
2009.10 - 2009.12 BUSAN AN-GOAL BRAND BRIDGE TURNKEY PJT SHIP MANEUVERING SIMULATION, SHIP COLLISION AND RISK ANALYSIS FOR DAELIM CONSTRUCTION AND ENGINEERING
2009.08 - 2009.10 SARANG-DO BRIDGE TURN KEY PROJECT Grand Bridge Liability Analysis, Ship Collision Analysis and Risk Assessment. For SAMSUNG HEAVY INDUSTRIES Co. Ltd.
2009.08 - 2009.10 INCHON NEW PORT ROAD TURN KEY PROJECT Cable-Stayed Grand Bridge Soil-Structure Interaction Analysis, Wind Tunnel Dynamic Analysis for Cable Vibration, Seismic Analysis, Concrete Creep and drying shrinkage for POSCO Construction and Engineering Co. Ltd.
2009.04 - 2009.10 UPTAE-AMTAE GRAND BRIDGE NO.1 PROJECT Marine Assessment(Ship maneuvering), Ship Collision Protection Basic Design for Hyundai Construction and Engineering Co. Ltd.
2009.03 - 2009.10 BORYEONG-TAEAN GRAND BRIDGE NO.2 PROJECT Marine Assessment(Ship maneuvering), Ship Collision Protection Basic Design for Hyundai Construction and Engineering Co. Ltd.
2009.03 - 2009.07 BORYEONG-TAEAN GRAND BRIDGE NO.1 PROJECT Marine Assessment(Ship maneuvering), Ship Collision Protection Basic Design for Hyundai Construction and Engineering Co. Ltd.
2009.01 - 2009.09 AM-SA Grand Bridge Installation Project Grand Bridge Offshore SuperLift Design/Tow Design/Loadout Design
2008.10 - 2009.12 DO HA-DUCK KYEA ROAD AND TUNNEL TURNKEY PJT Bridge pier/Tunnel/Slope stability/Soil Boring Investigation Work for DOHA ENGINEERING
2005.06 - 2006.07 NAM-HWANG GRAND BRIDEG INSTALLATION PJT Bridge Offshore Installation using 2000 TON Crane(Motion and Stability analysis) for SEHO ENG.
2005.06 - 2006.07 MAGOK GRAND BRIDGE INSTALLATION PJT Bridge Offshore Installation using 2-Barge with Lifting Tower(Motion and Stability analysis) for NOWON INDUSTRIES
2005.03 - 2005.06 GE-JAE GRAND BRIDGE TURN KEY PJT (Pier Caisson Dynamic Transportation Analysis with Wave and Current/ Installation Dynamic Analysis/ 3-Body Motion Time Domain Analysis Wet Towing and Down-Ending, Up-Ending Analysis, Ship Mooring Analysis for DAEWOO E&C CO., LTD)