Ȩ > »ç¾÷½ÇÀû > µµ·Î ¹× ±³·® ¼³°è
DATE | Project Name | Project Description |
---|---|---|
2019.07~2020.07 | Detail Design of Youngjong-Cheongra No.3 Bridge | Simulation of Ship Crash |
2018.05~2018.08 | Structural Performance Analysis of Stranded Wire | Structural performance review According to stranded wire corrosion |
2015.08~2016.08 | Cambodia 311Km Road Project | DETAIL ENGINEERING FOR 311KM ROAD |
2015.03~2015.05 | 5,400 DWT Project | 5,400DWT SEA TRANSPORTATION STUDY |
2015.02~2015.03 | Old Yang-Su Bridge Dismantlement Project | Verification for Capsizing of Transportation Barge |
2014.12~2015.02 | GSP Neptun Project | Bridge Lifting and Mooring Design using 900ton Derric Crane |
2013.10-2014.05 | Old-Yang-Su Grand Bridge Dismantle PJT | Bridge Dismantle and Barge Motion and Super-Lift Engineering |
2013.07-2013.12 | Gun-Jang Grand Bridge PJT | 3600ton Bridge Lifting and Derric Crane Dynamic Motion Analysis |
2013.01-2013.02 | TOP-SOME WALKWAY BRIDGE PJT | Detail design for Bridge |
2012.03-2012.10 | YangSu Grand Bridge Project | Bridge Float Over and Stability Design |
2012.02-2012.05 | Young Kwang-HyeJae Grand Brideg | Bridge Ship Collision and Navigation Desion for Yoosin/Hyoundai E&C |
2011.03-2011.05 | WHAYANG-CHEKUM PHASE NO.2 OFFSHORE BRIDGE TURNKEY | Bridge Ship Collision and Navigation Desion for HEC |
2011.02-201106 | NOWHA-GUDO PHASE NO.2 OFFSHORE BRIDGE TURNKEY PJT | Bridge Ship Collision and Navigation Desion for HEC |
2010.07-2010.09 | ManKyeong Phase No. 5 Ship Collision and Navigatio | Ship Collision and Navigation Desion for Korea Gorverment - Hanjin E&C - Whansin Eng |
2010.05-2010.10 | ManKyeong Phase No. 3 Ship Collision and Navigatio | Ship Collision and Navigation Desion for Korea Gorverment - Lotte E&C-Dong-Il Eng |
2010.05-2010.07 | Turnkey Pjt Sin gi-Kogum Bridge - Ship Collision a | Ship Collision and Navigation Desion for Kolon E&C Co., Ltd. - Yoosin Eng |
2010.03-2010.09 | SORAE POGU Port Ship Collision and Navigation Desi | Ship Collision and Navigation Desion for Samsung Construction and Engineering Co., Ltd. |
2010.03-2010.04 | Han River Bridge - Ship Collision and Navigation D | Ship Collision and Navigation Desion for Hangang Development Co., Ltd. - Yoosin/Hanjong Eng |
2009.12-2010.01 | HA YI- SIN YI BRIDGE TURNKEY PROJECT | SHIP MANEUVERING SIMULATION, SHIP COLLISION AND RISK ANALYSIS FOR YUSIN AND NAMYANG CONSTRUCTION CO. LTD. |
2009.10 - 2009.12 | BUSAN AN-GOAL BRAND BRIDGE TURNKEY PJT | SHIP MANEUVERING SIMULATION, SHIP COLLISION AND RISK ANALYSIS FOR DAELIM CONSTRUCTION AND ENGINEERING |
2009.08 - 2009.10 | SARANG-DO BRIDGE TURN KEY PROJECT | Grand Bridge Liability Analysis, Ship Collision Analysis and Risk Assessment. For SAMSUNG HEAVY INDUSTRIES Co. Ltd. |
2009.08 - 2009.10 | INCHON NEW PORT ROAD TURN KEY PROJECT | Cable-Stayed Grand Bridge Soil-Structure Interaction Analysis, Wind Tunnel Dynamic Analysis for Cable Vibration, Seismic Analysis, Concrete Creep and drying shrinkage for POSCO Construction and Engineering Co. Ltd. |
2009.04 - 2009.10 | UPTAE-AMTAE GRAND BRIDGE NO.1 PROJECT | Marine Assessment(Ship maneuvering), Ship Collision Protection Basic Design for Hyundai Construction and Engineering Co. Ltd. |
2009.03 - 2009.10 | BORYEONG-TAEAN GRAND BRIDGE NO.2 PROJECT | Marine Assessment(Ship maneuvering), Ship Collision Protection Basic Design for Hyundai Construction and Engineering Co. Ltd. |
2009.03 - 2009.07 | BORYEONG-TAEAN GRAND BRIDGE NO.1 PROJECT | Marine Assessment(Ship maneuvering), Ship Collision Protection Basic Design for Hyundai Construction and Engineering Co. Ltd. |
2009.01 - 2009.09 | AM-SA Grand Bridge Installation Project | Grand Bridge Offshore SuperLift Design/Tow Design/Loadout Design |
2008.10 - 2009.12 | DO HA-DUCK KYEA ROAD AND TUNNEL TURNKEY PJT | Bridge pier/Tunnel/Slope stability/Soil Boring Investigation Work for DOHA ENGINEERING |
2005.06 - 2006.07 | NAM-HWANG GRAND BRIDEG INSTALLATION PJT | Bridge Offshore Installation using 2000 TON Crane(Motion and Stability analysis) for SEHO ENG. |
2005.06 - 2006.07 | MAGOK GRAND BRIDGE INSTALLATION PJT | Bridge Offshore Installation using 2-Barge with Lifting Tower(Motion and Stability analysis) for NOWON INDUSTRIES |
2005.03 - 2005.06 | GE-JAE GRAND BRIDGE TURN KEY PJT | (Pier Caisson Dynamic Transportation Analysis with Wave and Current/ Installation Dynamic Analysis/ 3-Body Motion Time Domain Analysis Wet Towing and Down-Ending, Up-Ending Analysis, Ship Mooring Analysis for DAEWOO E&C CO., LTD) |