Ȩ > »ç¾÷½ÇÀû > ÇØÀú¹è°ü/ÀÏÁ¡°è·ù½Ã¼³
DATE | Project Name | Project Description |
---|---|---|
2019.05~2019.06 | Bid Design and Technical Support for Vietnam NCS2 | Bid Design of Offshore Pipeline |
2019.01~2019.02 | Nam Con Son Phase 2 Offshore Pipeline Package | Bid Design of Offshore Pipeline |
2018.08~2018.12 | Design of Petron Aromatics BED Project(Marine) | Basic design of jetty and subsea pipeline |
2017.09~2017.12 | Bahrain LNG IT Project | Jacket and Subsea Pipeline Design of LNG Import Terminal |
2017.04~2017.06 | Al Mandous Project Bid Design | Subsea Pipeline, SPM, PLEM Design of Refinery Plant |
2016.05~2017.03 | CBM Re-Design | Detail Engineering of CBM for Mooring of 5,000 to 35,000 DWT Vessel and Upgrade Marine Facilities |
2015.12~2019.07 | Al-Zour Refinery(ZOR) project Package 5 | Detail Engineering for Process/Subsea Pipeline/Jetty/Habour |
2015.10~2017.11 | Design of Ulsan Buoy Relocation Construction | Detail Engineering for Subsea Pipeline |
2014.11-2014.12 | NSRP Package E PJT | Outfall and Intake Detail Design |
2014.11~2015.01 | TACE Project | Sea Water Intake FEED |
2014.10~2014.12 | Ulsan Oil Hub Project | Subsea Pipeline Bidding Engineering |
2014.05-2015.01 | NRP PJT | FEED for Process / Subsea Pipeline / Jetty / Harbour Engineering |
2014.02~2014.05 | Cable Installation Project | Cable Turn-Table Installation Design |
2013.2-Till date | NGHI SON REFINERY AND PETROCHEMICAL PROJECT | Detail Engineering for 48"x 34.5Km-2Line Submarine Pipeline and SPM/PLEM Detail Engineering |
2013.2-2013.6 | Mostaganem PJT in Algeria | Bidding Engineering for Outfall & Intake Engineering |
2013.11-2013.12 | Cable Laying PJT | Turntable&Loading Tower Transportation Analysis |
2013.10-2013.11 | LS Cable PJT | Cable Lay-Turntable & Loading Tower Tow Design |
2013.04-2014.30 | Lithum FPSO R&D 4th Project | 4"x 1Km Chemical Pipeline Basic$Detail, Installation Engineering |
2013.04-2014.10 | NSRP Package-C PJT | 2-48"-34.5km Pipeline and PLEM/SPM/FOC Detail Design |
2013.01-2015.03 | Refinery and marine terminal Jazan/SAUDI | Detail Engineering for Offshore Pipeline 2-Lines 48"-8km and PLEM/SPM & 2ND SPM(2-Line x 2.5km) |
2013.01-2014.01 | JAZAN REFINERY AND MARINE | FEED Verification for 48"x 8Km-2Line Submarine Pipeline and SPM/PLEM Detail Engineering |
2013.01-2013.02 | MIRFA INDEPENDENT WATER AND POWER PROJECT | Bidding Engineering for Outfall & Intake Engineering |
2013.01-2013.02 | MIRFA INDEPENDENT WATER AND POWER PROJECT/UAE | Outfall FEED Engineering |
2012.12-2014.12 | Ghana Takoradi T2 Expansion Project | 3.5m x 1km x 4sets HDPE Intake Detail and Installation Engineering |
2012.12-2013.04 | NSRP Refinery Project/Vietnam | FEED & Bidding Engineering for Offshore Pipeline 2-Lines 48"-34.5km and PLEM/SPM |
2012.09-2014.12 | Oman Musanduam Pipeline Installation Project | Musandam Offshore Pipeline Installation Field Engineering Works |
2012.05-2012.06 | Bunker Fuel Project ATB HDD PIPELINE | FEED Engineering |
2011.06~2012.05 | S-OIL New SPM and Pipeline Project | Basic & Detail ENG-42"-7Km Submarine Pipeline and PLEM, SPM Refurbish, Detail Engineering(In-service, Installation and Material Specification) for DAEWOO Engineering |
2011.03-2013.08 | Musandum Processing Plant Project | Detail ENG-Submarine Pipeline and Riser 42"/12"/36" x 0.75¡±-5.0Km, Detail Engineering(In-service, Installation and Material Specification) for HYUNDAI Engineering |
2011.01-2011.05 | S-OIL NEW SPM PROJECT | FEED for Onshore and Offshore Pipeline 42" x 9Km and Pump Station Design for SK E&C |
2010.10-2011.03 | HST/TGT-BH PVGAS PIPELINE PROJECT IN VIETNAM | Submarine Pipeline and Riser 12.7¡± x 0.5¡±-30.0Km, PLEM Detail Engineering(In-service, Installation and Material Specification) for HHI |
2010.09-2010.10 | NSRP Submarine Pipeline - 2Lines-46" x 30km | Submarine Pipeline and Riser 46¡± x 0.75¡±-30.0Km, Detail Engineering(In-service, Installation and Material Specification) for SK Construction and Engineering |
2010.08~2014.03 | LITHUM FPSO R&D Prpjec | EPC for Lithum FPSO Chemical Rise and Pipeline FEED/BASIC/DETAIL and CONSTRUCTION for KIGAM |
2010.07-2010.09 | Musandum Processing Plant Project | FEED ENG-Submarine Pipeline and Riser 16¡± x 0.75¡±-30.0Km, FEED Engineering(In-service, Installation and Material Specification) for HYUNDAI Engineering |
2010.05-2010.06 | SOGT Refinery Plant PJT in Malaysia | FEED Engineering and Pipeline Installation Excusion Plan for Samsung Engineering Co., Ltd. |
2010.02-2010.02 | Colombo Port Expansion Project, Sri Lanka | SPM Mooring Analysis and Buoy Design |
2009.05 – 2010.5 | Colombo Port Expansion Project, Sri Lanka | 36¡± x 0.75¡±-6.0Km -Pipeline Laying Analysis and Installation/Construction Procedure, Lay-Barge Equipment Foundation Detail Design and Drawings, Lay-Barge Mooring Design and Drawings |
2009.03 - 2009.08 | NAN-GI DO PE SUBSEA PIPELINE DESIGN PROJECT | 406¥õ X 16WT-20.0Km -Pipeline Laying Analysis and Installation/Construction Procedure, Lay-Barge Equipment Foundation Detail Design and Drawings, Lay-Barge Mooring Design and Drawings |
2009.03 - 2009.04 | CNOOC 16¡± SUBSEA PIPELINE INSTALLATION PROJECT | TECHNICAL PROPOSAL FOR BIDDER |
2008.06 – 2010.5 | Colombo Port Expansion Project, Sri Lanka | Submarine Pipeline and Riser 36¡± x 0.75¡±-6.0Km, Detail Engineering(In-service, Installation and Material Specification) for Hyundai Construction and Engineering |
2007.02 - 2007.04 | Colombo Port Expansion Project, Sri Lanka | Submarine Pipeline and Riser 36¡± x 0.75¡±-8.0Km, FEED Engineering for MTO Design, Design Specification, Insitu Stress, Laying Design, Existing pipeline demolish simulation for Hyundai Construction and Engineering |