시공감리

프로젝트 분류

DATE Project Name Project Description
2008.02-2009.06 HHI’s H-DRY DOCK Project Dry Dock : 340m x 100m, Production Shop 100m x 60m
2007.08-2008.09 PYUNG TAEK MULTIPURPOSE PORT CONSTRUCTION Length of Quay : 450m, Seashore Protection?: 417m, Reclamation : 282.873m3
2007.04-2008.12 DAESAN PORT LEVEL 1-2 PIER CONSTRUCTION Length of Pier : 480m , Breakwater : 250m
2006.12-2007.12 GUNJANG NEW HABOR SOUTH INTERIOR WALL SECTION 3 CO Quay Wall Construction : 800m long, Dredging Work, Shore Protection : 286m long
2006.08-2007.08 PYEONGTAEK-DANGJIN PORT HARBOR REAR POT CONSTRUCTI Quay Wall Construction : 2000m long, Dredging Work, Shore Protection : 456m long
2006.02–Till date GUMUSUT KAKAP FPU PROJECT Hull and Topside Construction and Fabrication
2005.12-2007.08 POHANG NEW PORT PIER 2 CONSTRUCTION JETTY 1200m and Slab / Pile
2005.12-2006.01 HYUNDAI HEAVY INDUSTRY SHORE PROTECTION BREAKWATER Shore Protection : 213m long, Quay Wall : 280m, Breakwater : 330m
2005.09-2005.11 BUSAN-GEOJE ROAD CONSTRUCTION JUNGJUK ARTIFICIAL ISLAND CONSTRUCTION
2005.06-2006.03 SEOSAN PIER CONSTRUCTION JETTY 1000m and Slab / Pile
2005.01-2007.11 BUILD A ROAD & AIRPORT RUNNING WAY Road 35km-80km/h
2004.9 - 2008.10 BUSAN - GEOJE ROAD PRIVATE INVESTMENT BUSINESS CONSTRUCTION, PRODUCTION FIELD FORMATION CONSTRUCTION
2004.6 - 2006.3 PYEONGTAEK(AHSAN) PORT EAST PIER(#6,7,8) CONSTRUCT Shore Protection : 200m long, Quay Wall : 500m, Breakwater : 430m
2004.5 - 2007.8 POHANG NEW PORT #2 PIER CONSTRUCTION Caisson Casting & Launching /Placing Work for 3 Vessel Mooring
2004.4 - 2008.5 INCHEON INTERNATIONAL AIRPORT LEVEL 2 #3 RUNWAY CO Running Way Construction : 4km, Earth Work
2004.3 - 2007.5 CHOONGJU STATE ROAD (YONGU - GEUMGA) Running Way Construction : 42km, Earth Work
2004.2 - 2007.3 INCHEON NORTH PORT PRIVATE INVESTMENT BUSINESS CON 71 Caissons / Underwater Work , 3 Vessel Mooring Simultaneously
2003.6 - 2007.1 PYEONGTAEK(AHSAN) PORT VEHICLE ONLY PIER (#9,10)