Ȩ > »ç¾÷½ÇÀû > Áö¹Ý ¼³°è
DATE | Project Name | Project Description |
---|---|---|
2021.11~2022.02 | Offshore Geotechnical Survey for Yokjido Offshore | Offshore Geotechnical Survey for Yokjido Offshore Wind Power |
2018.12~2019.10 | Geotechnical Survey for 5 Boreholes | Geotechnical Survey |
2013.07-2013.12 | Gun-Jang Grand Bridge PJT | Temporary Structure and Bridge Detail Engineering |
2012.08-2013.01 | Railway Bridge and Box for Western Line | Temporary Structure and Bridge and Tunnel Box Detail Design for Western Railway |
2012.03-2012.10 | YangSu Grand Bridge Project | Detail Design for Bridge and Temporary Structure |
2012.02-2012.10 | Monitoring Settlement in Entrance Structures to Ma | OF ENGINEERING SERVICES FOR MONITORING SETTLEMENT IN ENTRANCE STRUCTURES for ADMM, UAE |
2012.02-2012.05 | Young Kwang-HyeJae Grand Bridge | Detail Design for Bridge and Temporary Structure |
2011.03-2011.05 | WHAYANG-CHEKUM PHASE NO.2 OFFSHORE BRIDGE TURNKEY | Basic Design for Bridge and Temporary Structure |
2011.02-2011.06 | NOWHA-GUDO PHASE NO.2 OFFSHORE BRIDGE TURNKEY PJT | Basic Design for Bridge and Temporary Structure |
2010.09-2011.02 | YEOSU EXPO Marina Pontoon Design | Floating Structure Pile and Geotechnical Design for Hyundai Construction and Engineering Co., Ltd. |
2010.09-2011.01 | SKIKDA REFINARY PROJECT IN Algeria | Module Foundation and Transportation Road Reinforcement for Samsung Engineering Co., Ltd. |
2010.05-2010.07 | Turnkey Pjt Sin gi-Kogum Bridge | Temporary Structure and Bridge Detail Engineering |
2010.04-2010.06 | YEOSU THERMAL POWER PLANT PJT | Soil bearing and Underground existing pipeline stress Aanlysis |
2009.12-2011.03 | HA YI- SIN YI BRIDGE TURNKEY PROJECT | Basic & Detail Design for Bridge and Temporary Structure |
2003.11–2004.02 | Development of tunnel, bridge construction method | FDM analysis of Tunnel and wind tunnel development, Bridge VIV and Arch. Bridge construction development |