Track Records
ffshore/Onshore Platform
Onshore Power Plant
Onshore Refinery Plant
Offshore Wind/Wave/Current
Pipeline and SPM
LNG Plant and LNG FSRU
Ship and Floater
Shipyard Optimization
Oil Tank Farm Design
Harbour and Port
Road and Bridge
Ternkey Solution Project
Marina Project
Geotechnical Project
Supervision for Construction

Home > Track Records > Offshore/Onshore Platform for Oil and Gas

Offshore/Onshore Platform for Oil and Gas

Project Categories

DATE Project Name Project Description
2023.07~2024.12 S-Oil Shaheen Project Analysis of module transport
2023.05~2024.02 St. Charles Clean Fuels Blue Ammonia Project Analysis of module transport
2022.08~2022.12 Analysis of Module Structure Transport Anasysis of module transport
2022.02~2022.03 PAS Structural Analysis PAS Structural Analysis
2022.01~2022.12 Civil Design of GEP2 Plant(Offshore) Offhsore civil structural design of SK Boryeong clean hydrogen office
2022.01~2022.03 Structural Analysis Works Membrane skid structural analysis
2021.03~2021.08 Structural Analysis for CO2 Removal Package-Step 2 Structural Analysis for Almirrante Tamandare FPSO
2021.03~2021.08 Structural Analysis for CO2 Removal Package-Step 1 Structural Analysis for Pre-treatment Skid and Membrane Skid
2020.10~2021.05 The Sunshine Project Module Transportation Analysis
2019.05~2019.08 Module Construction Method and Transport. Analysis Module Construction Method and Transportation Analysis
2018.11~2019.03 Stability Review of ENI Module Stability Review of ENI Module
2018.08~2018.11 Sulphur Recovery Unit Train 3 in Malaysia Civil design for onshore plant
2018.05~2018.12 Polymery Police PDH/PP Project in Poland Civil design for offshore plant
2018.03~2018.10 Feasibility Study for Bashundhara Int. Terminal Feasibility study for Oil & Gas international terminal development in Bangladesh
2018.02~2019.03 Petrochemical Complex Plant Jetty, Chittagong Design of petrochemical complex plant jetty in Bangladesh
2018.02~2018.07 Transportation Analysis of IGD-E2 Module Module transportation analysis
2017.11~2018.08 Total Engineering Service of LPG Marine Terminal Design of Marine Terminal for LPG and HFO
2017.10~2017.12 Design of Gangway including Pipeline Design of Gangway(1.5km) for LPG Receiving Terminal
2017.09~2018.04 Coral South Development Project Laboratory & Utili Structrual Analysis and Design for FLNG
2017.04~2017.05 Structural Analysis Report on Cracked Concrete Blo Structural Analysis of Cracked Concrete Blocks
2016.06~2016.11 Model of Cast Node and Calculation of Load Data Strength and Fatigue Assessment for Offshore Structures and Cast Nodes
2016.05~2016.09 Structure Analysis of Platform for SSPP Project Structure Analysis of Platform for SSPP Project Stage-2 Foam Building
2016.04~2016.07 Design of Offshore Platform for CO2 Injection Construction Phase Design of Jacket Type Offshore Platform for CO2 Injection
2016.03~2016.12 R&D on Structure Design for ARC7 Offshore Plant Ice Proof Structural Design of ARC7 Class Offshore Plant for Polar Environment
2016.03~2016.10 SARB Field Engineering Detail Engineering for Satah Al Razboot(SARB) Field
2015.12~2016.10 Structure Detail Engineering for NASR PKG-2 Transportation Fatigue Detail Design for Bridge, BST JKT & Deck
2015.06~2015.12 SSPP Project Jetty Catwalk PSC/PC Catwalk Design, Unloading Platform, Breasting Dolphin, Mooring Dolphin, Catwalk Pier Design
2015.05~2017.05 NASR II Project Transportation Fatigue Detail Design for Bridge, BST JKT & Deck
2015.03~2016.02 Bergading Project Offshore Fixed Platform Inplace/pre-service Detail Engineering
2015.03~2016.02 Baronia Project Offshore Fixed Platform Inplace/pre-service Detail Engineering
2014.11-2015.09 Badamyar PJT Offshore Fixed Platform Inplace/Pre-serives Detail Engineering
2013.08-2013.11 YETAGUN PHASE V DEVELOPMENT PROJECT JACKET Launching/Upending and Onbottom Stability Design
2013.07-2015.02 CARLIGALI HESS BCP Jacket Roll-up and Fabriction/Load-out Engineering
2013.02-2013.05 Offshore Container /ONGC High Pressure Container Box Design
2013.01-2013.05 TEEKAY PETROJARL PJT Offshore Fixed Platform Topside In-service and Pre-service Design
2012.07-2012.12 Lube Oil Container /Vietnam High Pressure Container Box Design
2012.07-2012.09 ONGC Heera Re-Development pjt Process Platform Float-Over Design
2012.06-2013.03 Valemon Fixed Platform MTO DESIGN, IN-SERVICE for INPLACE, FATIGUE, SEISMIC, BLASTING, PRE-SERVICE for LIFTING and, PILE DESIGN, TRANSPORTATION, INSTALLATION Design and PIPELINE / RISER 4¡±, 6¡¯, 12¡±, 18¡±, 20¡± IN-SERVICE and PIPELAYING Detail Engineering
2012.02~2012.05 Umm Lulu PKG#2/Abu Dhabi Marine Operating Company Jacket and Module Fabrication Bidding Engineering for Young Chang Heavy Industries, co. Ltd.
2011.11~2012.03 GUMUSUT KAKAP FPU TOPSIDE Gumusut Kakap FPU East/West/South/North/ Topside Global Strengthening and Twisting Analysis for MMHE Malaysia.
2011.10~2011.12 OSX WHPs JACKET BIDDING ENGINEERING FOR FABRICATION & LOAD-OUT PLAN for Hyundai Steel co., Ltd.
2010.01-2010.12 KEARL OIL SANDS PROJECT Shipment Vessel Motion and Green Water and Seafastening Design for Dong-Bang Co. Ltd. And Sung-gi Geotech Co. Ltd.
2009.12-2010.06 DAEWOO MIYANMA OFFSHORE PLATFORM PROJECT L/Q and Helideck Inplace and Dynamic Design for HHI
2009.11-2009.12 KEARL OIL SANDS PROJECT 4-Shipment Vessel Motion and Route Study for Dong-Bang Co. Ltd. And Sung-gi Geotech Co. Ltd.
2009.10 - 2009.12 BONGOT PRODUCTION PLATFORM INDEPENDENT ANALYSIS AN Offshore Production Platform Topside and Jacket Inplace and Dynamic Independent Analysis for HYUNDAI Heavy Industries Co. Ltd.
2008.02 - 2008.06 VASAI ONGC PLATFORM PJT Design for Installation and Construction Engineering of North and South Module, Building Module including Sea Transportation and Vessel Motion and Mooring Design for SAMSUNG Heavy Industries in Korea
2008.02 - 2008.04 B193A-Offshore Fixed Platform (ONGC) from Ramunia FEED Engineering for DECK/JACKET and PIPELINE(105km) And Riser(12Nos)
2006.12 - 2008.02 UMM SHAIF FIXED PLATFORM PJT MTO DESIGN, IN-SERVICE for INPLACE, FATIGUE, SEISMIC, BLASTING, PRE-SERVICE for LIFTING and, PILE DESIGN, TRANSPORTATION, INSTALLATION Design and PIPELINE / RISER 4¡±, 6¡¯, 12¡±, 18¡±, 20¡± IN-SERVICE and PIPELAYING Detail Engineering for HHI
2006.12 - 2007.03 EGP-3 CHEVRON NIGERIA PROJECT Detail Engineering and Transportation for Module-7EA and Pipe Rack – 5EA for HYUNDAI HEAVY INDUSTRIES
2006.08 - TILL DATE GUMUSUT KAKAP FPU PROJECT Super-Lift, Load-out, Float-off Design and Block handling Design, Hull FEM Analysis, Buckling Analysis, Motion Analysis, Hydrodynamic Analysis, Float-Off, Transportation Detail Design for MMHE Malaysia
2006.08 - 2006.6.11 BLOCK-5 PACKAGE 16, 17&18 PJT PLATFORM FEED / BASIC / MTO DESIGN (Inplace / Dynamic / Fatigue/Tow / Float-Over/Lifting and SUBMARINE PIPELINE / RISER FEED / BASIC DESIGN (Design Specification, Insitu Stress Design, Laying Design) for HYUNDAI HEAVY INDUSTRIES CO., LTD.(HHI).)
2006.01 - 2006.08 MOHO BILONDO FPSO PJT TOPSIDE BASIC / DETAIL DESIGN / HULL BASIC & DETAIL (FE Analysis, Buckling and Mooring Analysis of Hull, Topside In-place / Damage / Tow / Lifting / Motion Spectral Fatigue / Wind Spectral Fatigue) and FLEXIBLE PIPELINE / RISER Detail Engineering for HYUNDAI HEAVY INDUSTRIES(HHI).
2005.08 - 2007.02 SEMAN-KUM/ILYANG CHO/BACKRYEONG ISLAND OFFSHORE JA DETAIL DESIGN(Jacket Inplace / Fatigue / Seismic / Transportation / Construction Eng/Specification / Document Up-ending analysis, Cable Laying for KORDI)
2004.10 - 2004.12 ILYANG CHO/BACKRYEONG ISLAND OFFSHORE JACKET PJT CONCEPTUAL DESIGN(Jacket Inplace / Fatigue / Seismic / Transportation / Construction Eng/Specification / Document Up-ending analysis, Cable Laying for KORDI)
2003.1 - 2003.12 NC41C Offshore Platform Project (Basic design for Vibration of machinery, Equipment foundation, Flare Tower, Blasting analysis due to LRFD and Piping Analysis and Construction engineering for HYUNDAI HEAVY INDUSTRIES CO. LTD.)
2003.02 - 2003.5.20 KIZOMBA FPSO PROJECT HULL and TOPSIDE In-Service and Pre-Service Detail Design and Engineering/ Fixed Offshore Platform In-Service and Pre-Service Detail Design and Engineering/ Pipeline and Riser 16¡± and 20¡± Detail Design and Engineering for HYUNDAI HEAVY INDUSTRIES
2002.7 - 2003.1 BLOCK-5/PACKAGE 4/5/6/7/8-MEARSK OIL QATAR Well head platform, water injection platform, compressor modules, Flare platform and Accommodation platform, Submarine Pipeline, Riser and J-tube In-place and Installation Detail design and engineering for HYUNDAI HEAVY INDUSTRIES.)
2001.11 - 2002.7 BLOCK-5/PACKAGE 4/5/6/7/8-MEARSK OIL QATAR Well head platform, water injection platform, compressor modules, Flare platform and Accommodation platform design and Piping engineering for HYUNDAI HEAVY INDUSTRIES.
2001.04 - 2001.11 Eardo offshore measuring platform in JE JU Island (Korea ocean research, institute, Korea)
2001.01 - 2003.01 NA-KIKA FPU (Construction Engineering such as Superlift and Loadout, Tow Anlalysis, Mooring Analysis engineering and Piping Analysis for HYUNDAI HEAVY INDUSTRIES.)
Quick