Home > Track Records > Offshore/Onshore Platform for Oil and Gas
DATE | Project Name | Project Description |
---|---|---|
2023.07~2024.12 | S-Oil Shaheen Project | Analysis of module transport |
2023.05~2024.02 | St. Charles Clean Fuels Blue Ammonia Project | Analysis of module transport |
2022.08~2022.12 | Analysis of Module Structure Transport | Anasysis of module transport |
2022.02~2022.03 | PAS Structural Analysis | PAS Structural Analysis |
2022.01~2022.12 | Civil Design of GEP2 Plant(Offshore) | Offhsore civil structural design of SK Boryeong clean hydrogen office |
2022.01~2022.03 | Structural Analysis Works | Membrane skid structural analysis |
2021.03~2021.08 | Structural Analysis for CO2 Removal Package-Step 2 | Structural Analysis for Almirrante Tamandare FPSO |
2021.03~2021.08 | Structural Analysis for CO2 Removal Package-Step 1 | Structural Analysis for Pre-treatment Skid and Membrane Skid |
2020.10~2021.05 | The Sunshine Project | Module Transportation Analysis |
2019.05~2019.08 | Module Construction Method and Transport. Analysis | Module Construction Method and Transportation Analysis |
2018.11~2019.03 | Stability Review of ENI Module | Stability Review of ENI Module |
2018.08~2018.11 | Sulphur Recovery Unit Train 3 in Malaysia | Civil design for onshore plant |
2018.05~2018.12 | Polymery Police PDH/PP Project in Poland | Civil design for offshore plant |
2018.03~2018.10 | Feasibility Study for Bashundhara Int. Terminal | Feasibility study for Oil & Gas international terminal development in Bangladesh |
2018.02~2019.03 | Petrochemical Complex Plant Jetty, Chittagong | Design of petrochemical complex plant jetty in Bangladesh |
2018.02~2018.07 | Transportation Analysis of IGD-E2 Module | Module transportation analysis |
2017.11~2018.08 | Total Engineering Service of LPG Marine Terminal | Design of Marine Terminal for LPG and HFO |
2017.10~2017.12 | Design of Gangway including Pipeline | Design of Gangway(1.5km) for LPG Receiving Terminal |
2017.09~2018.04 | Coral South Development Project Laboratory & Utili | Structrual Analysis and Design for FLNG |
2017.04~2017.05 | Structural Analysis Report on Cracked Concrete Blo | Structural Analysis of Cracked Concrete Blocks |
2016.06~2016.11 | Model of Cast Node and Calculation of Load Data | Strength and Fatigue Assessment for Offshore Structures and Cast Nodes |
2016.05~2016.09 | Structure Analysis of Platform for SSPP Project | Structure Analysis of Platform for SSPP Project Stage-2 Foam Building |
2016.04~2016.07 | Design of Offshore Platform for CO2 Injection | Construction Phase Design of Jacket Type Offshore Platform for CO2 Injection |
2016.03~2016.12 | R&D on Structure Design for ARC7 Offshore Plant | Ice Proof Structural Design of ARC7 Class Offshore Plant for Polar Environment |
2016.03~2016.10 | SARB Field Engineering | Detail Engineering for Satah Al Razboot(SARB) Field |
2015.12~2016.10 | Structure Detail Engineering for NASR PKG-2 | Transportation Fatigue Detail Design for Bridge, BST JKT & Deck |
2015.06~2015.12 | SSPP Project Jetty Catwalk | PSC/PC Catwalk Design, Unloading Platform, Breasting Dolphin, Mooring Dolphin, Catwalk Pier Design |
2015.05~2017.05 | NASR II Project | Transportation Fatigue Detail Design for Bridge, BST JKT & Deck |
2015.03~2016.02 | Bergading Project | Offshore Fixed Platform Inplace/pre-service Detail Engineering |
2015.03~2016.02 | Baronia Project | Offshore Fixed Platform Inplace/pre-service Detail Engineering |
2014.11-2015.09 | Badamyar PJT | Offshore Fixed Platform Inplace/Pre-serives Detail Engineering |
2013.08-2013.11 | YETAGUN PHASE V DEVELOPMENT PROJECT | JACKET Launching/Upending and Onbottom Stability Design |
2013.07-2015.02 | CARLIGALI HESS BCP | Jacket Roll-up and Fabriction/Load-out Engineering |
2013.02-2013.05 | Offshore Container /ONGC | High Pressure Container Box Design |
2013.01-2013.05 | TEEKAY PETROJARL PJT | Offshore Fixed Platform Topside In-service and Pre-service Design |
2012.07-2012.12 | Lube Oil Container /Vietnam | High Pressure Container Box Design |
2012.07-2012.09 | ONGC Heera Re-Development pjt | Process Platform Float-Over Design |
2012.06-2013.03 | Valemon Fixed Platform | MTO DESIGN, IN-SERVICE for INPLACE, FATIGUE, SEISMIC, BLASTING, PRE-SERVICE for LIFTING and, PILE DESIGN, TRANSPORTATION, INSTALLATION Design and PIPELINE / RISER 4¡±, 6¡¯, 12¡±, 18¡±, 20¡± IN-SERVICE and PIPELAYING Detail Engineering |
2012.02~2012.05 | Umm Lulu PKG#2/Abu Dhabi Marine Operating Company | Jacket and Module Fabrication Bidding Engineering for Young Chang Heavy Industries, co. Ltd. |
2011.11~2012.03 | GUMUSUT KAKAP FPU TOPSIDE | Gumusut Kakap FPU East/West/South/North/ Topside Global Strengthening and Twisting Analysis for MMHE Malaysia. |
2011.10~2011.12 | OSX WHPs JACKET | BIDDING ENGINEERING FOR FABRICATION & LOAD-OUT PLAN for Hyundai Steel co., Ltd. |
2010.01-2010.12 | KEARL OIL SANDS PROJECT | Shipment Vessel Motion and Green Water and Seafastening Design for Dong-Bang Co. Ltd. And Sung-gi Geotech Co. Ltd. |
2009.12-2010.06 | DAEWOO MIYANMA OFFSHORE PLATFORM PROJECT | L/Q and Helideck Inplace and Dynamic Design for HHI |
2009.11-2009.12 | KEARL OIL SANDS PROJECT | 4-Shipment Vessel Motion and Route Study for Dong-Bang Co. Ltd. And Sung-gi Geotech Co. Ltd. |
2009.10 - 2009.12 | BONGOT PRODUCTION PLATFORM INDEPENDENT ANALYSIS AN | Offshore Production Platform Topside and Jacket Inplace and Dynamic Independent Analysis for HYUNDAI Heavy Industries Co. Ltd. |
2008.02 - 2008.06 | VASAI ONGC PLATFORM PJT | Design for Installation and Construction Engineering of North and South Module, Building Module including Sea Transportation and Vessel Motion and Mooring Design for SAMSUNG Heavy Industries in Korea |
2008.02 - 2008.04 | B193A-Offshore Fixed Platform (ONGC) from Ramunia | FEED Engineering for DECK/JACKET and PIPELINE(105km) And Riser(12Nos) |
2006.12 - 2008.02 | UMM SHAIF FIXED PLATFORM PJT | MTO DESIGN, IN-SERVICE for INPLACE, FATIGUE, SEISMIC, BLASTING, PRE-SERVICE for LIFTING and, PILE DESIGN, TRANSPORTATION, INSTALLATION Design and PIPELINE / RISER 4¡±, 6¡¯, 12¡±, 18¡±, 20¡± IN-SERVICE and PIPELAYING Detail Engineering for HHI |
2006.12 - 2007.03 | EGP-3 CHEVRON NIGERIA PROJECT | Detail Engineering and Transportation for Module-7EA and Pipe Rack – 5EA for HYUNDAI HEAVY INDUSTRIES |
2006.08 - TILL DATE | GUMUSUT KAKAP FPU PROJECT | Super-Lift, Load-out, Float-off Design and Block handling Design, Hull FEM Analysis, Buckling Analysis, Motion Analysis, Hydrodynamic Analysis, Float-Off, Transportation Detail Design for MMHE Malaysia |
2006.08 - 2006.6.11 | BLOCK-5 PACKAGE 16, 17&18 PJT | PLATFORM FEED / BASIC / MTO DESIGN (Inplace / Dynamic / Fatigue/Tow / Float-Over/Lifting and SUBMARINE PIPELINE / RISER FEED / BASIC DESIGN (Design Specification, Insitu Stress Design, Laying Design) for HYUNDAI HEAVY INDUSTRIES CO., LTD.(HHI).) |
2006.01 - 2006.08 | MOHO BILONDO FPSO PJT | TOPSIDE BASIC / DETAIL DESIGN / HULL BASIC & DETAIL (FE Analysis, Buckling and Mooring Analysis of Hull, Topside In-place / Damage / Tow / Lifting / Motion Spectral Fatigue / Wind Spectral Fatigue) and FLEXIBLE PIPELINE / RISER Detail Engineering for HYUNDAI HEAVY INDUSTRIES(HHI). |
2005.08 - 2007.02 | SEMAN-KUM/ILYANG CHO/BACKRYEONG ISLAND OFFSHORE JA | DETAIL DESIGN(Jacket Inplace / Fatigue / Seismic / Transportation / Construction Eng/Specification / Document Up-ending analysis, Cable Laying for KORDI) |
2004.10 - 2004.12 | ILYANG CHO/BACKRYEONG ISLAND OFFSHORE JACKET PJT | CONCEPTUAL DESIGN(Jacket Inplace / Fatigue / Seismic / Transportation / Construction Eng/Specification / Document Up-ending analysis, Cable Laying for KORDI) |
2003.1 - 2003.12 | NC41C Offshore Platform Project | (Basic design for Vibration of machinery, Equipment foundation, Flare Tower, Blasting analysis due to LRFD and Piping Analysis and Construction engineering for HYUNDAI HEAVY INDUSTRIES CO. LTD.) |
2003.02 - 2003.5.20 | KIZOMBA FPSO PROJECT | HULL and TOPSIDE In-Service and Pre-Service Detail Design and Engineering/ Fixed Offshore Platform In-Service and Pre-Service Detail Design and Engineering/ Pipeline and Riser 16¡± and 20¡± Detail Design and Engineering for HYUNDAI HEAVY INDUSTRIES |
2002.7 - 2003.1 | BLOCK-5/PACKAGE 4/5/6/7/8-MEARSK OIL QATAR | Well head platform, water injection platform, compressor modules, Flare platform and Accommodation platform, Submarine Pipeline, Riser and J-tube In-place and Installation Detail design and engineering for HYUNDAI HEAVY INDUSTRIES.) |
2001.11 - 2002.7 | BLOCK-5/PACKAGE 4/5/6/7/8-MEARSK OIL QATAR | Well head platform, water injection platform, compressor modules, Flare platform and Accommodation platform design and Piping engineering for HYUNDAI HEAVY INDUSTRIES. |
2001.04 - 2001.11 | Eardo offshore measuring platform in JE JU Island | (Korea ocean research, institute, Korea) |
2001.01 - 2003.01 | NA-KIKA FPU | (Construction Engineering such as Superlift and Loadout, Tow Anlalysis, Mooring Analysis engineering and Piping Analysis for HYUNDAI HEAVY INDUSTRIES.) |