DATE | Project Name | Project Description |
---|---|---|
2021.01~2021.09 | Utilities & Offsites for Borouge 4 Project | Civil Design for Container Terminal performance improvement |
2020.07~2021.02 | Design for Container Wharf of Incheon New Port | Crane Wind Tunnel Analysis, Fixture Design and Structural Stability Review of Caisson Steel Pipe Piles |
2019.12~2020.01 | Design of Coastal Road and Pier Reinforcement | Design of Coastal Road and Pier |
2019.02~2019.10 | Feasibility Study of Myanmar Offshore Terminal Dev | Feasibility Study of Offshore LNG Terminal |
2018.06~2018.12 | Study of Jacket Facilities and Safety Evaluation | Study of the status evaluation of port jacket facilitiesand safety evaluation criteria |
2017.05~2017.09 | Jangbogo Port Construction Turnkey Project | Structure Design of Naval Port |
2017.02~2017.10 | Feasibility Study for Multipurpose Port Developmen | Feasibility Study for Multipurpose Port Development |
2015.09~2016.01 | Design of Busan New Port West Container Terminal | FD Mooring Stability Analysis and Stability of ship yard, Caisson Transportation/Towing/Launching Analysis |
2015.06~2015.12 | Julong Port Project | Caisson Design and Transportation Detail Design |
2015.04~2015.06 | FD 11,000 Verification Project | Launching Simulation for 2-Cassion |
2015.04~2015.06 | Busan North Port Project | Floating Bridge Detail Design |
2015.02~2015.03 | SM200 Phase I Project | Ship Mooring Case Study- BD & MD Design |
2015.01~2015.04 | YeoSu New North Breakwater Turnkey Project | Caisson Transportation, FSSI, Seismic Risk Analysis |
2014.12~2015.05 | Go-Sung Green Power Port Project | Ship mooring Detail engineering |
2014.07-2015.11 | Turnkey GA-GU Port | Caisson Block Transportation and Floating Dock Stability and Motion Study |
2014.03~2015.04 | H-dock Project | 50ton Bitt Capsize Verification and Reinforment Detail Engineering |
2014.02-2014.04 | Inchon International Passenger Port 2nd Phase Tern | Detail Engineering of Caisson Block Transportation and Floating Dock Stability and Motion Study |
2013.11-2014.05 | Turnkey PJT-Sadong Port | Caisson Block Transportation and Floating Dock Stability and Motion Study |
2013.08-2014.01 | Turnkey for Ulsan New Port | 350K-VLCC Motion for SPM Mooring and Caisson Block FD Stability and Motion |
2013.06-2014.12 | Nakhodka Mineral Fertilizer Plant (Phase 1) | FEED for Harbour and Intake/Outfall Design |
2013.04-2013.06 | Hundai Steel Port Project | 400,000ton Class Ship Mooring Design |
2013.03-2013.06 | Pohang South Port Phase 1 and Zone-1 Project | Detailed Engineering for Breakwater and Foundation |
2013.03-2013.06 | Incheon Ferry Port Turnkey PJT | Harbour and Structure Detail Engineering and 30,000DWT Berthing Pontoon Design |
2013.03-2013.05 | Pohang South Port Phase 1 Project | 8700ton Cassion Floating and Stability Design using 11,000ton F/D |
2013.02-2013.06 | Inchon International Passenger Port 2nd Phase Tern | Pontoon Mooring & Structural Design/ Ship Mooring & Manuvering Analysis / reliability Design for Cassion and 80m x 30m Bridge |
2012.02-2012.07 | H-Dock Cofferdam Structure Project | Basic and Detail Engineering/Design and Installation for Hyundai Conctruction and Engineering Co., Ltd. |
2012.02-2012.05 | Dreged Arena in Song-Do Turn-key PJT | Basic Design for Quaywall, Berthing and Mooring, Ship maneuvering for SK E&C |
2011.07- 2012.03 | Pusan East Port New Development Project | Mooring Analysis and Floating and Submerged Pontoon Design for Punsan Port Development for Daelim E&C |
2011.06-2011.08 | Ulsan North Port New Development Project | Mooring Analysis and Floating and Submerged Pontoon Design for Ulsan Port Development for Hala E&C Co., Ltd. |
2011.01- 2012.05 | SAMCHEG PORT PROJECT | F/D Strengthening and Floating Dock and Caisson Transportation and Floatation Analysis for Dongbu E&C |
2011.01- 2011.07 | POWHANG YOUNGIL MAN PORT TURNKEY PJT | Caisson Design and Transportation / Floatation Design / Marine Assessment(Ship maneuvering), Ship Mooring analysis, Seismic Analysis for Quay, Fatigue FE-Analysis for Quay, Towing Analysis for Caisson, Launching analysis of Caisson for SK E&C |
2011.01- 2011.04 | HYUNDAI STEEL PORT PJT | Caisson Design and Transportation / Floatation Design / Marine Assessment(Ship maneuvering) for SEIL ENG |
2011.01- 2011.03 | DONGHAE LIFT DOCK FACILITIES TURNKEY PJT | Caisson Design and Transportation / Floatation Design / Marine Assessment(Ship maneuvering), Ship Mooring analysis, Seismic Analysis for Quay, Fatigue FE-Analysis for Quay, Towing Analysis for Caisson, Launching analysis of Caisson for HANJIN-KECC |
2010.10-2010.12 | GAM-CHEN PORT TURNKEY PJT | Marine Assessment(Ship maneuvering), Ship Mooring analysis, Seismic Analysis for Quay, Fatigue FE-Analysis for Quay, Towing Analysis for Caisson, Launching analysis of Caisson for GS Construction and Engineering Co., Ltd.(KOREA HABOUR ENG) |
2010.10-2010.11 | SAMCHEG PORT PROJECT | Floating Dock and Caisson Transportation and Floatation Analysis for Dongbu E&C |
2010.04-2010.10 | Pusan Ocean Police Port | MOORING ANALYSIS FOR OCEAN POLICE VESSEL-KUNIL ENG |
2009.11 - 2009.12 | MMHE 25K LOADOUT QUAY WALL AND SKID FOUNDATION FOR | Marine Assessment(Ship maneuvering), 25K Loadout and Skid Foundation, Inplace and Foundation Design / Construction Specification / Mechanical and Electrical Design / Seismic Design / Chloride Ion permeation of Concrete Analysis for SAMSUNG Heavy Industries Co., Ltd. |
2009.10 – 2010.05 | NEW MATERIAL HANDLING QUAY FOR MMHE IN MALAYSIA TU | Marine Assessment(Ship maneuvering), New MHQ and Extension Quay No.8 Inplace and Foundation Design / Construction Specification / Mechanical and Electrical Design / Seismic Design / Chloride Ion permeation of Concrete Analysis for SAMSUNG Heavy Industries Co., Ltd. |
2009.10 - 2009.12 | POHANG YOUNG-IL PORT BREAK WATER TURN KEY PROJECT | Marine Assessment(Ship maneuvering), Chloride Ion permeation of Concrete Analysis for Quay, Fatigue FE-Analysis for Quay, Towing and Installation Analysis for Caisson, Launching analysis of Caisson for SK Construction and Engineering Co., Ltd. |
2009.09-2009.12 | INCHON NEW PORT CAISSON AND F/D STRUCTURAL DESIGN | Caisson transportation and Launching Analysis and F/D Hull FE analysis for HDEC |
2009.08 - 2009.10 | ULSAN NORTH BREAK WATER TURN KEY PROJECT | Marine Assessment(Ship maneuvering), Ship Mooring analysis, Seismic Analysis for Quay, Fatigue FE-Analysis for Quay, Towing Analysis for Caisson, Launching analysis of Caisson for GS Construction and Engineering Co. Ltd. |
2009.03 - 2009.07 | JAE-JU NAVAL BASE PORT TURNKEY PJT | Marine Assessment(Ship maneuvering), Ship Mooring analysis, Seismic Analysis for Quay, Fatigue FE-Analysis for Quay, Towing Analysis for Caisson, Launching analysis of Caisson for SK Construction and Engineering Co. Ltd. |
2008.06 - 2008.10 | MMHE WEST FINGER PIER AND OTHER ASSOCIATED WORK | Inplace Design(For west finger pier and Material Handling Quay), Seismic Design(For west finger pier and Material Handling Quay), Capstan, Pump Room, Substation Architecture Design for SHI |
2006.07 - 2006.08 | Q-CHEM-¥± PETROCHEMICAL COMPLEX MESIEED INDUSRRIAL | Mooring Analysis of TANKER for DEAWOO CONSTRUCTION AND ENGINEERING CO. LTD |
2006.02 - 2006.03 | JEJU PORT SECOND LEVEL TURNKEY PJT | Marine Assessment(Ship maneuvering), Seismic Analysis and Risk Feasibility, 3D FEM and Crack Propagation analysis due to Dynamic Wave Loads, Ship Mooring Analysis for DAELIM E&C CO. LTD |
2005.10 - 2006.03 | OFFSHORE BERTHING JETTY PJT- STRENGTHNING | ANALYSIS (Ship Impact Analysis, Ship Mooring with Berthing Analysis for DEAWOO E&C CO. LTD.) |
2005.01 - 2005.03 | PYEONG-TAEK PORT TURNKEY PJT | Marine Assessment(Ship maneuvering), Caisson Dynamic wave analysis/Container Crane Structure Analysis/ Ship impact Analysis/ Ship Mooring Analysis /Silt Protection Dynamic Analysis/Caisson Crack Propagation Analysis/ Flexible Submarine pipeline In-place and Installation Analysis/Pile Fatigue Analysis for DAELIM E&C CO., LTD) |
2004.07 - 2004.12 | BUSAN SOUTH-CONTAINER PORT PJT | Marine Assessment(Ship maneuvering), (Wind tunnel dynamic analysis-CFD, Caisson Dynamic wave analysis/Container Crane Structure Analysis/ Ship Mooring Analysis /Ship impact Analysis/Silt Protection Dynamic Analysis/Caisson Crack Propagation Analysis/SPM Dynamic Analysis/Pile Fatigue Analysis for DAELIM CONSTRUCTION&ENG CO., LTD) |
2004.02 - 2004.06 | JINHEA NAVAL PORT TURN KEY PJT | Marine Assessment(Ship maneuvering), (Caisson Dynamic wave analysis/Container Crane Structure Analysis/ Ship Mooring Analysis /Ship impact Analysis/Silt Protection Dynamic Analysis/Caisson Crack Propagation Analysis/SPM Dynamic Analysis/Pile Fatigue Analysis for POSCO E&C CO., LTD) |
2003.7 - 2003.11 | BUSAN NEW PORT-BUK CONTAINER PORT TURN-KEY PJT | (Caisson Dynamic Wave Analysis/Container Crane Structure Analysis/ Ship Mooring Analysis /Ship impact Analysis/Silt Protection Dynamic Analysis/Caisson Crack Propagation Analysis/SPM Dynamic Analysis/Pile Fatigue Analysis for HYUNDAI DEVELOPMENT CO., LTD.) |
2003.1 - 2003.4.26 | KWANG-YANG LNG TERMINAL JETTY Project | (Sea Transportation and motion design, Lifting padeye design and detailed design of Jetty Structure for SUNG-CHANG CO. LTD.) |
2003.01 - 2003.4.20 | KWANG YANG-JUNGMA PORT TURN-KEY FOR DEALIM | (Mooring analysis and report, Crane structural analysis and report, Caisson Fatigue and FEM with elastic-plastic analysis, Seismic analysis) |