Track Records
ffshore/Onshore Platform
Onshore Power Plant
Onshore Refinery Plant
Offshore Wind/Wave/Current
Pipeline and SPM
LNG Plant and LNG FSRU
Ship and Floater
Shipyard Optimization
Oil Tank Farm Design
Harbour and Port
Road and Bridge
Ternkey Solution Project
Marina Project
Geotechnical Project
Supervision for Construction

Home > Track Records > Road and Bridge

Road and Bridge

Project Categories

DATE Project Name Project Description
2019.07~2020.07 Detail Design of Youngjong-Cheongra No.3 Bridge Simulation of Ship Crash
2018.05~2018.08 Structural Performance Analysis of Stranded Wire Structural performance review According to stranded wire corrosion
2015.08~2016.08 Cambodia 311Km Road Project DETAIL ENGINEERING FOR 311KM ROAD
2015.03~2015.05 5,400 DWT Project 5,400DWT SEA TRANSPORTATION STUDY
2015.02~2015.03 Old Yang-Su Bridge Dismantlement Project Verification for Capsizing of Transportation Barge
2014.12~2015.02 GSP Neptun Project Bridge Lifting and Mooring Design using 900ton Derric Crane
2013.10-2014.05 Old-Yang-Su Grand Bridge Dismantle PJT Bridge Dismantle and Barge Motion and Super-Lift Engineering
2013.07-2013.12 Gun-Jang Grand Bridge PJT 3600ton Bridge Lifting and Derric Crane Dynamic Motion Analysis
2013.01-2013.02 TOP-SOME WALKWAY BRIDGE PJT Detail design for Bridge
2012.03-2012.10 YangSu Grand Bridge Project Bridge Float Over and Stability Design
2012.02-2012.05 Young Kwang-HyeJae Grand Brideg Bridge Ship Collision and Navigation Desion for Yoosin/Hyoundai E&C
2011.03-2011.05 WHAYANG-CHEKUM PHASE NO.2 OFFSHORE BRIDGE TURNKEY Bridge Ship Collision and Navigation Desion for HEC
2011.02-201106 NOWHA-GUDO PHASE NO.2 OFFSHORE BRIDGE TURNKEY PJT Bridge Ship Collision and Navigation Desion for HEC
2010.07-2010.09 ManKyeong Phase No. 5 Ship Collision and Navigatio Ship Collision and Navigation Desion for Korea Gorverment - Hanjin E&C - Whansin Eng
2010.05-2010.10 ManKyeong Phase No. 3 Ship Collision and Navigatio Ship Collision and Navigation Desion for Korea Gorverment - Lotte E&C-Dong-Il Eng
2010.05-2010.07 Turnkey Pjt Sin gi-Kogum Bridge - Ship Collision a Ship Collision and Navigation Desion for Kolon E&C Co., Ltd. - Yoosin Eng
2010.03-2010.09 SORAE POGU Port Ship Collision and Navigation Desi Ship Collision and Navigation Desion for Samsung Construction and Engineering Co., Ltd.
2010.03-2010.04 Han River Bridge - Ship Collision and Navigation D Ship Collision and Navigation Desion for Hangang Development Co., Ltd. - Yoosin/Hanjong Eng
2009.12-2010.01 HA YI- SIN YI BRIDGE TURNKEY PROJECT SHIP MANEUVERING SIMULATION, SHIP COLLISION AND RISK ANALYSIS FOR YUSIN AND NAMYANG CONSTRUCTION CO. LTD.
2009.10 - 2009.12 BUSAN AN-GOAL BRAND BRIDGE TURNKEY PJT SHIP MANEUVERING SIMULATION, SHIP COLLISION AND RISK ANALYSIS FOR DAELIM CONSTRUCTION AND ENGINEERING
2009.08 - 2009.10 SARANG-DO BRIDGE TURN KEY PROJECT Grand Bridge Liability Analysis, Ship Collision Analysis and Risk Assessment. For SAMSUNG HEAVY INDUSTRIES Co. Ltd.
2009.08 - 2009.10 INCHON NEW PORT ROAD TURN KEY PROJECT Cable-Stayed Grand Bridge Soil-Structure Interaction Analysis, Wind Tunnel Dynamic Analysis for Cable Vibration, Seismic Analysis, Concrete Creep and drying shrinkage for POSCO Construction and Engineering Co. Ltd.
2009.04 - 2009.10 UPTAE-AMTAE GRAND BRIDGE NO.1 PROJECT Marine Assessment(Ship maneuvering), Ship Collision Protection Basic Design for Hyundai Construction and Engineering Co. Ltd.
2009.03 - 2009.10 BORYEONG-TAEAN GRAND BRIDGE NO.2 PROJECT Marine Assessment(Ship maneuvering), Ship Collision Protection Basic Design for Hyundai Construction and Engineering Co. Ltd.
2009.03 - 2009.07 BORYEONG-TAEAN GRAND BRIDGE NO.1 PROJECT Marine Assessment(Ship maneuvering), Ship Collision Protection Basic Design for Hyundai Construction and Engineering Co. Ltd.
2009.01 - 2009.09 AM-SA Grand Bridge Installation Project Grand Bridge Offshore SuperLift Design/Tow Design/Loadout Design
2008.10 - 2009.12 DO HA-DUCK KYEA ROAD AND TUNNEL TURNKEY PJT Bridge pier/Tunnel/Slope stability/Soil Boring Investigation Work for DOHA ENGINEERING
2005.06 - 2006.07 NAM-HWANG GRAND BRIDEG INSTALLATION PJT Bridge Offshore Installation using 2000 TON Crane(Motion and Stability analysis) for SEHO ENG.
2005.06 - 2006.07 MAGOK GRAND BRIDGE INSTALLATION PJT Bridge Offshore Installation using 2-Barge with Lifting Tower(Motion and Stability analysis) for NOWON INDUSTRIES
2005.03 - 2005.06 GE-JAE GRAND BRIDGE TURN KEY PJT (Pier Caisson Dynamic Transportation Analysis with Wave and Current/ Installation Dynamic Analysis/ 3-Body Motion Time Domain Analysis Wet Towing and Down-Ending, Up-Ending Analysis, Ship Mooring Analysis for DAEWOO E&C CO., LTD)
Quick