Track Records
ffshore/Onshore Platform
Onshore Power Plant
Onshore Refinery Plant
Offshore Wind/Wave/Current
Pipeline and SPM
LNG Plant and LNG FSRU
Ship and Floater
Shipyard Optimization
Oil Tank Farm Design
Harbour and Port
Road and Bridge
Ternkey Solution Project
Marina Project
Geotechnical Project
Supervision for Construction

Home > Track Records > Ternkey Solution Project(Complex Project)

Ternkey Solution Project (Complex Project)

Project Categories

DATE Project Name Project Description
2022.05~2023.07 Expressway No.400 Metropolitan Area 2nd Loop Line Simulation of ship collision
2021.11~2022.07 Pyeongtack-Osong 2nd Double-Track Construction Detail design of structural field
2021.07~2021.12 Private Investment P/J for Metropolitan Railway Detail design of structural field
2021.04~2021.12 Gangneung-Jecheon Single-Track Railway Basic design of structural field
2020.12~2021.06 Incheon New Port Stage 1-2 Container Pier P/J Structural stability review for Basic and Detail Design of caisson steel pipe piles
2018.05~2019.01 Busan New Port Container Terminal #2-6 T/K Project Numerical analysis of crane wind tunnel and design of securing device
2014.10-2014.12 GSP Neptun Derric Crane Dynamic Motion PJT Heavy Lifter Dynamic Motion Analysis
2010.03-2010.10 FEASIBILITY STUDY OF LNG CHAIN TRADING BETWEEN BOL FEASIBILITY STUDY OF LNG CHAIN TRADING BETWEEN BOLIVIA AND URUGUAY
2010.03-2010.10 EPC SERVICES OF 10MMSCMPD RAW GAS RETREATMENT PLAN FEED ENGINEERING FOR SERVICES FOR FOR 10MMSCMPD RAW GAS PRETREATMENT PLANT
2010.03-2010.10 Turnkey Solution of Logistics, Port and Shipyard f Feed and Basic Design for Road/ Iron Ore Stockyard/Port/Shipyard

Quick