Home > Track Records > Oil Tank Farm Design
DATE | Project Name | Project Description |
---|---|---|
2014.10-2014.12 | Ulsan Oil Hub PJT | FEED for Process / Subsea Pipeline / Jetty / Tankfarm Engineering |
2012.05-2012.06 | Construction of Oil Storage Tanks Phase 2 for ATB. | FEED Engineering/ Total number of 39 Tanks for about 600,000 cubic meter (m3) oil storage tanks, of various sizes similar to current Phase 1 project |
2010.04-2010.06 | Tailand Rayon Tank Terminal Jetty Project | MOORING ANALYSIS FOR OIL TANKER AND GAS CARRIER |
2009.10-2009.11 | YESU- OT KNOC OIL STORAGE FACILITIES TURNKEY PJT | Bidding Engineering of Mooring/Berthing/Trestle Bridge and Storage Tank Design for Samsung Heavy Industries Co. Ltd. |
2008.12 - 2009.06 | SUN-IL TANK TERMINAL PROJECT in Korea | 2,000KL API GRAVITY TANK-8SETS Basic and Detail Engineering, Dike/Foundation and On-Land Pipeline Basic and Detail Engineering |
2007.12 - 2008.06 | SUN-IL TANK TERMINAL PROJECT in Korea | 2,000KL API GRAVITY TANK-10SETS Basic and Detail Engineering, Dike/Foundation and On-Land Pipeline Basic and Detail Engineering |
2007.05 - 2007.10 | BIO-OIL TANK TERMINAL PROJECT | 2000KL API GRAVITY TANK-4SETS Basic and Detail Engineering, Dike/Foundation and On-Land Pipeline Basic and Detail Engineering |
2006.06 - 2006.12 | NECS OIL CO., LTD. CRUDE OIL TANK TERMINAL PROJECT | 990KL API GRAVITY TANK-5SETS Basic and Detail Engineering, Dike/Foundation and On-Land Pipeline Basic and Detail Engineering |
2006.04 - 2006.10 | SUN-IL CRUDE OIL TANK TERMINAL PROJECT | 2000KL API GRAVITY TANK-8SETS Basic and Detail Engineering, Dike/Foundation and On-Land Pipeline Basic and Detail Engineering |
2005.07 - 2006.01 | HYE-IN CO., LTD. LNG TANK TERMINAL PROJECT | 990KL API GRAVITY TANK-9SETS Basic and Detail Engineering, Dike/Foundation and On-Land Pipeline Basic and Detail Engineering |
2005.06 - 2005.12 | SUN-IL CO., LTD. CRUDE OIL TANK TERMINAL PROJECT | 2000KL API GRAVITY TANK-7SETS Basic and Detail Engineering, Dike/Foundation and On-Land Pipeline Basic and Detail Engineering |
2004.09-2004.12 | JEM ENERGY CO., LTD. LNG TANK TERMINAL PROJECT | 2000KL API GRAVITY TANK-8SETS/990KL API GRAVITY TANK-4SETS Basic and Detail Engineering, Dike/Foundation and On-Land Pipeline Basic and Detail Engineering |
2004.06-2004.09 | KYEONG-DONG ENERGY CO., LTD. CRUDE OIL TANK TERMIN | 2000KL API GRAVITY TANK-8SETS Basic and Detail Engineering, Dike/Foundation and On-Land Pipeline Basic and Detail Engineering |