Home > Track Records > Onshore Power Plant
DATE | Project Name | Project Description |
---|---|---|
2020.08~2021.04 | Design of 154kV Bulro Substation | Design of Substation Civil Works |
2018.08~2019.02 | Detail Design of Statcom Facilities Foundation | Design of Statcom facilities foundation for 345kV Godeok S/S |
2017.06~2018.05 | Design of 154kV Suchon Substation | Design of Substation |
2017.04~2017.08 | Feasibility Study for LNG Power Plant 360MW in Dom | Feasibility Study for LNG Power Plant 360MW |
2017.01~2018.01 | New Gori Nuclear Power Plant #5,6 PCC Pipeline Des | PCC Pipeline Design of Nuclear Power Plant |
2016.10~2017.07 | Design of 154kV Namgunpo Substation | Design of Substation |
2016.08~2017.03 | Design of 154kV Deokso Substation | Design of Substation |
2016.06~2017.04 | Detail Design of 154kV Seoganghwa Substation | Design of Substation |
2015.03~2015.05 | GAS Ulsan PDH Project | Detail Design of Sea Transportation for W.H. Boiler |
2011.02~2011.05 | TERMAL EXCHANGER PROJECT | Condensor Design for Inplace/Seismic/Thermal Effect for Sung Bu ENC |
2010.9-2010.10 | Stack Thermal Simulation and Stress Analysis | Stack Thermal Simulation and Stress Analysis |
2010.10-2010.11 | TERMAL EXCHANGER PROJECT | Tube Thermal and Creep Fatigue Analysis for Hanyang Industries |
2009.11-2009.12 | Sonils Luanda, Angola PMC PJT | BIDDING ENGINEERING OF PRODUCTION SHOP, BUILDING AND CIVIL WORKS, PLANT FOR GTS CO. LTD. |
2009.10-2009.11 | Angola -SOYO BASE PLANT PMC PJT | BIDDING ENGINEERING OF PRODUCTION SHOP, BUILDING AND CIVIL WORKS, PLANT FOR GTS CO. LTD. |