DATE | Project Name | Project Description |
---|---|---|
2012.1~2012.5 | Jin-Mok Shipyard | Basic Design Lifit Dock and Quaywall, Berthing and Mooring, Ship maneuvering for Kum-Ho/Deco E&C |
2010.02-2011.07 | MMHE SHIPYARD OPTIMIZATION(HANMI PARSUNS) | Shipyard and Drydock, Quaywall Optimization Works for MMHE in Malaysia |
2009.03 - 2009.05 | 30TON GANTRY CRANE DESIGN | 30TON GANTRY CRANE DESIGN FOR DAE-DONG ENG. |
2008.08 – 2009.05 | UTC BRAZILIAN OFFSHORE YARD OPTIMIZATION | FEED Engineering for Offshore Yard Optimization for UTC, Yard Lay-Out, Dry Dock, DockGate, Production Shop(Grand, 3D,2D,Cutting shop, Blasting and Painting Shop) |
2008.02 - 2008.04 | SELF STUDY FOR RAMMUNIA OFFSHORE YARD(SHIP YARD) | Pre-Study for Ship Yard Optimization Yard Foundation, PE. Etc. |
2007.12 - 2008.02 | GUNSAN HHI¡¯s DRY DOCK Project | Detail Foundation Design, Dock Gate Design, Gate Sill Design and Dry Dock Wall, Winch, Capstan, Pump Room, Substation Architecture Design for HHI |
2007.08 - 2008.12 | HHI¡¯s H-DRY DOCK Project | Detail Foundation Design, Dock Gate Design, Gate Sill Design and Dry Dock Wall, Winch, Capstan, Pump Room, Substation Architecture Design, Painting and Production Shop Design for HHI |
2006.12 - 2007.08 | SUBIC SHIP YARD OPTIMIZATION for HANJIN | Design for Part of Dock and C/C Foundation, PE. Etc. Design for Part of Dry Dock No. 1 and 2, Production and Painting Shop. Quay Wall(1000m) and Yard Foundation, PE. Etc. |
2005.11 - 2006.05 | OVERHEAD/GANTRY CRANE 900ton PJT | Structure Design and Fatigue, Local Design, Design for Mechanical items such as Hook, Loading Beam, Bogie for Shin-han Machinery Industries Co. Ltd. |