Home > Track Records > Marina Project
DATE | Project Name | Project Description |
---|---|---|
2015.03~2015.06 | Sae-Man-Kum East-West Crossing Road Project | Ship Collision and Ship manuvering Simulation |
2012.01-2012.05 | Yeo-Su Fishing Hole Project | Pontoon Mooring Anaysis for Yoosin/Hyoundai E&C |
2011.06- 2012.07 | Floating Island in Han River Project | Basic & Detail ENG-Engineering(In-service, Installation and Material Specification) including Floating Bridge for Flower Co., Ltd. |
2011.06- 2011.12 | JAE PORT AND ARASHIP ROAD MARINA PROJECT | Floating Pontoon and Walkway Global Analysis, Local buckling design Mooring design, Berthing Fender Design, Walk-bridge Design for CK Marine Co., Ltd. |
2011.01-2011.03 | CHUNG JU FLOATING MARINA YACHT DEVELOPMENT TURNKEY | Floating Structure Mooring and Motion Design due to Shipwave/Wave for JinWoo ENG |
2010.09-2011.03 | YESU EXPO Marina Pontoon Design | Floating and Submerged Pontoon Design for Hyundai Construction and Engineering Co., Ltd. |
2010.09-2010.10 | Pusan Suyoung Man Marina Project | Floating Pontoon and Walkway Global Analysis, Local buckling design Mooring design, Berthing Fender Design, Walk-bridge Design for CK Marine |
2010.04-2010.06 | MAGOK MARINA PORT DESIGN | Floating Pontoon and Walkway Global Analysis, Local buckling design Mooring design, Berthing Fender Design, Walk-bridge Design for CK Marine |
2009.12-2009.12 | JEJU HAYE PORT MARINA PONTOON AND PILE DESIGN | POTTON AND PILE DESIGN FOR SAMSUNG HEAVY INDUSTRIES CO. LTD. |
2009.08 - 2009.10 | KEYING-IN RIVER FLOATING MARINA YACHT DEVELOPMENT | Floating Walkway Global Analysis, Local buckling design Mooring design, Berthing Fender Design, Walk-bridge Design |
2009.06 - 2009.10 | HAN RIVER FLOATING ISLAND DEVELOPMENT PROJECT | Floating Hull Global Analysis, Local buckling design Mooring design, Architecture Design LED Structure Design |
2005.06 - 2006.08 | JEJU SUNGSAN-PO UNDERWATER VIEWING PLATFORM PJT | BASIC AND DETAIL DESIGN (Sea 180m Long Bridge, Pier, Underwater viewing Platform- Seismic, Inplace, Loadout, Transportation, Installation Dynamic Analysis) for BOKWANG CO. LTD. |
2000.05 - 2001.04 | Thalassopolis sea hotel in Incheon city | Dike/Offshore Pile Foundation/Structure Design/ Hotel Structure Design/Seismic Design/Wave Fatigue Design (Archi¡¯esse co., Ltd, Korea) |